Devcon Archive logo
Devcon Devconnect Forum Blog
  • Watch
  • Event
    Event: background logo
    • Devcon 8
    • Devconnect ARG
    • Devcon 7
    • Devcon 6
    • Devcon 5
    • Devcon 4
    • Devcon 3
    • Devcon 2
    • Devcon 1
    • Devcon 0
  • Categories
    Categories: background logo
    • Cryptoeconomics
    • Devcon
    • Developer Experience
    • Coordination
    • Core Protocol
    • Layer 2s
    • Real World Ethereum
    • Cypherpunk & Privacy
    • Security
    • Applied Cryptography
    • Usability
  • Playlists

Suggested

Loading results..

View all

About Devcon —

Devcon is the Ethereum conference for developers, researchers, thinkers, and makers.

An intensive introduction for new Ethereum explorers, a global family reunion for those already a part of our ecosystem, and a source of energy and creativity for all.

  • Watch
  • Devcon
  • Devconnect
  • Forum
  • Blog

Get in touch

devcon@ethereum.org

Subscribe to our newsletter

Crafted with passion ❤️ at the Ethereum Foundation

© 2026 — Ethereum Foundation. All Rights Reserved.

devcon8 / glamsterdam for app developers what ethereums next fork changes for you

  • YouTube
  • Details

Glamsterdam for App Developers: What Ethereum's Next Fork Changes for You

Duration: 00:00:00

Speaker: Rahul Kothari

Type: Talk

Expertise: Some familiarity with the topic

Event: Devcon 8

Date: Nov 2026

https://docs.google.com/presentation/d/1q3xMElFXdash-Djm7i4OyDZ6cQJhHuV0/edit?usp=sharing&ouid=104333225551483296917&rtpof=true&sd=true Glamsterdam is not just a generic protocol-level upgrade: it changes what app developers can build and what can break. This talk focuses on the application-layer impact. We cover the 64 KiB contract size limit (up from 24 KiB) and what it means for libraries and diamond proxies, deeper stack access (DUPN/SWAPN/EXCHANGE) that removes most "stack too deep" errors, EIP-7708 logs for every ETH transfer that make ETH indexable via eth_getLogs, the new SLOTNUM opcode, gas repricing (state-creation costs, cheaper no-value calls), a higher gas limit floor, and the CREATE2 factory becoming required chain state. For each change: before, after, and the catches (e.g. higher deploy costs, log edge cases). Attendees get a concrete checklist for contracts, indexers and tooling.

Categories

RoadmapEVMDeveloper Tooling